How Much Do You Know About The Welding Process Of The Box Transformer Shell?
Jul 04, 2023
How much do you know about the welding process of the box transformer shell?
How to ensure that the box type substation has the characteristics of strong sealing, fire prevention, rain prevention, and earthquake resistance? The most important point, besides being related to its material, is still the welding process of its box transformer shell. The welding process is not well handled, which often leads to the box type substation being transported to the construction site and not yet installed before falling apart. Below is a detailed understanding
1. Preliminary preparation process for welding process of box transformer shell
a. Materials required to prepare: box transformer housing, AC arc candlestick machine, secondary protection welding machine, welding rod, welding wire, spot welding machine, welding pliers, hammer, wooden hammer, flat shovel, welding protective cap, box ruler, angle ruler, steel plate ruler, etc.
b. Pre preparation conditions: Firstly, you need to equip a professional welding technician, prepare tools, protective equipment, and check whether the welding machine is grounded properly; The sheet metal shell of the distribution box can only be processed after checking the drawings and technical requirements, and verifying that the incoming materials are correct; Remove dirt within 50mm of both sides of the welded edge of the part and keep it straight. Check and measure the tire fixture, and the flatness should not exceed 15% of the part thickness. Only after confirming that there are no errors can processing be carried out.
2. Precautions and process requirements for the welding process of the box transformer shell
During the welding process of the box transformer housing, attention should be paid to placing the workpiece in the accurate position according to the drawing requirements. After passing the measurement, spot welding should be carried out before welding, and if necessary, tire fixtures should be used; Try to use flat welding as much as possible. If welding in other positions, the welding current should be adjusted to reduce it by 10% compared to flat welding current; When the weld seam is long or the structural assembly is assembled, it should be fixed by spot welding in sections before welding to avoid deformation; After welding the box transformer, it is necessary to remove the coating, clean the welding overlap and slag, and ensure that the welding seam is smooth and clean; The grounding device of the box transformer casing should be fully welded around and should not damage the connecting threads. After forming, the appearance should be adjusted accordingly according to the drawing requirements and standards. In case of damage and leakage of equipment or power supply during welding, stop using immediately, and report to the competent department after cutting off the power supply.
3. Inspection process after welding the box transformer shell
The shape, size, and position of the weld seam should meet the technical requirements; The appearance of the welding seam shall not have defects such as undercut, incomplete fusion, burning through, welding overlap or missing welding; There should also be no defects such as slag inclusion, pores, and cracks
PRODUCT LINK
http://www.switchgear-china.com/ring-main-unit/sf6-insulated-switchgear/sf6-rmu-switchgear.html
http://www.switchgear-china.com/showroom/transforrmers-substation-1250kva-compact-distribution-transformer.html
PRODUCT PHOTO








This product is usually customized.
We are a manufacturer and have a professional technical department that can design and provide solutions according to customer needs.
Please contact our sales personnel to obtain design drawings
Here are our customer examples for your reference
Indian clients
| TECHNICAL REQUIREMENTS AND CHARACTERISTICS OF EQUIPMENT | ||||
| Re:82 sets compact substation | ||||
| Item- No. |
Schedule of Technical Data | Unit | Required (at 3000 m |
Offered Data |
| System Data Requirements | ||||
| 1.05.10 | Stranded copper conductor for earthing | |||
| Manufacturer | - | |||
| Material | - | copper | ||
| Cross-section | mm2 | >50 | ||
| Length | m | >40 | ||
| 1.05.11 | Earthing rods | |||
| Manufacturer | - | |||
| Type | - | |||
| Materia! | - | |||
| Length | m | |||
| Sections per rod | pcs | |||
| 1.6 | Compact Substations (Option 1) | |||
| Manufacturer | - | fengyuan | ||
| Type | - | OutDoor | ||
| Overall protection class for complete substation | - | IP 44 | IP 44 | |
| Material of enclosure | - | GI | ||
| Overall dimensions (W x L x H) | ||||
| for S/S with 1x50 kVA transformer | mm/mm/mm | 3000x1850x2150 | ||
| ■ for S/S with 1x100 kVA transformer | mm/mm/mm | 3000x1850x2150 | ||
| for S/S with 1x160 kVA transformer | mm/mm/mm | 3000x1850x2150 | ||
| • for S/S with 1x250 kVA transformer | mm/mm/mm | 3000x1850x2150 | ||
| Overall weight | ||||
| ■ for S/S with 1x50 kVA transformer | kg | 1000kg. | ||
| ■ for S/S with 1x100 kVA transformer | kg | 1000kg. | ||
| ■ for S/S with 1x160 kVA transformer | kg | 1000kg. | ||
| ■ for S/S with 1x250 kVA transformer | kg | 1000kg. | ||
| 1.6.1 | 20 kV Switchgear equipment | |||
| Manufacturer | - | Chnt / Equivalent | ||
| Type | - | Indoor RMU | ||