Construction scheme of box-type substation
Oct 11, 2020
Box-type substation is widely used in the power system as a main-stream substation. It pays great attention to planning a specific construction plan at the beginning of construction. Because of this, box-type substation manufacturers pay more attention to production quality, which can ensure efficient completion of construction and ensure construction. quality.
1. Before construction, carefully measure and prepare the position of the line, prepare the operation instructions and quality control measures of the position.
2. The unpacking quality inspection requirements of the box-type substation transported to the construction site are in charge of the supervision department, and the quality of the materials is checked by the materials department, quality inspectors, and technicians. The requirements for quality assurance materials such as equipment materials, test reports, and operating instructions are complete.
Three, a protection plan should be drawn up for the products and semi-products formed during the construction process. Carry out product and semi-product maintenance education on the needs of construction personnel on site.
Fourth, before the grounding body is buried, it is necessary to check the grounding trench through the supervision and then bury it.
5. Box-type substation installation requirements shall be constructed according to the national standard atlas.
VI. Strictly perform the inspection of the project quality, the collection of quality assurance materials, the prevention and manipulation of non-conforming products, and the compilation of completion documents as required.
During the construction of the box-type substation, in addition to surveying the terrain, it is necessary to ensure that the construction objectives meet the national requirements, and make specific construction records during the construction to ensure the smooth completion of the substation construction.