Standards The switchgear and main apparatus contained in it comply with the latest IEC Standards: • IEC 62271-1 for general purposes • IEC 62271-200 for the switchgear • IEC 62271-102 for the earthing switch • IEC 62271-100 for the circuit-breakers • IEC 60071-2 for the insulation coordination •...

Description

Standards

The switchgear and main apparatus contained in it comply with the latest IEC Standards:
• IEC 62271-1 for general purposes
• IEC 62271-200 for the switchgear
• IEC 62271-102 for the earthing switch
• IEC 62271-100 for the circuit-breakers
• IEC 60071-2 for the insulation coordination
• IEC 62271-106 for the contactors
• IEC 60265-1 for the switch-disconnectors
• IEC 60529 for degree of protections


Service environment:
a) Air temperature:Maximum temperature: +40℃; Minimum temperature:-25℃

b) Humidity:Monthly average humidity 95%; Daily average humidity 90% .

c) Altitude above sea level:Maximum installation altitude: 2500m

d) Ambient air not apparently polluted by corrosive and flammable gas, vapor etc.

e) No frequent violent shake



 


Fully type-tested

The switchgear has undergone all the tests required by the international (IEC) Standards. Each switchgear unit is subjected to routine tests in the factory before delivery. These tests are intended to provide a functional check of the switchgear based on the specific characteristics of each installation.

 

IEC type tests
• Short-time and peak withstand current
• Temperature rise
• Internal arc capability
• Dielectric test
• Making and breaking capacity of circuit-breaker
• Earthing switch making capacity (top application)
• Mechanical operations of circuit-breaker and line
disconnector
• IP degree and impact test


IEC routine factory tests
• Visual inspection and check
• Mechanical sequence operations
• Cabling check
• Electrical sequence operations
• Power frequency withstand voltage
• Measurement of the resistance of the main circuits
• Secondary insulation test

 

Our Factory:

53.7(001)

Related Products:

53.8


FAQ:

Q1. Can I have a sample order?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.


Q2. What about the lead time?

A:Sample needs 3-5 days, mass production time needs 1-2 weeks.


Q3. Do you have any MOQ limit for order?

A: Low MOQ, 1pc for sample checking is available


Q4. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.


Q5. How to proceed an order?

A: Firstly let us know your requirements or application.

Secondly We quote according to your requirements or our suggestions.

Thirdly customer confirms the samples and places deposit for formal order.

Fourthly We arrange the production.


Q6. Is it OK to print my logo on product?

A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.


Q7: How to deal with the faulty?

A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%.

Secondly, during the guarantee period, we will send new one with new order for small quantity. For defective batch products, we will repair them and resend them to you or we can discuss the solution including re-call according to real situation.


Hot Tags: 20kv medium voltage switchgear/ air insulated metal clad switchgear, China, manufacturers, suppliers, customized

(0/10)

clearall